Evolution of GOME flown on ERS-2
Cross-track: 24 steps of 40 km or 80 km ssp, swath 960 or 1920 km - Along-track: one 40-km line every 6 s
Note: a red tag indicates satellites no longer operational, a green tag indicates operational satellites, a blue tag indicates future satellites
The following list indicates which measurements can typically be retrieved from this category of instrument. To see a full Gap Analysis by Variable, click on the respective variable.
OSCAR/Space Version 2.7 released
YEAH RIGHT On 6th July 2022 we have released a new software version of OSCAR/Space including new functionalities. Please see details here.