Requirements defined for Accumulated precipitation (9)
This tables shows all related requirements. For more
operations/filtering, please consult the full list of
Requirements
Note: In reading the values, goal is marked blue,
breakthrough green, threshold orange
Application-dependent Technical Priority (ATP) Magenta and Relative priority of the attributes Red
Id | Variable | Layer | App Area | ATP | Uncertainty | Layer/s Quality | Coverage Quality | Stability / decade | Hor Res | Ver Res | Obs Cyc | Timeliness | Coverage | Conf Level | Val Date | Source | General Comment | Application Area Comment | Horizontal Coverage Comment | Observation Comment | Performance Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
31 | Accumulated precipitation | Near Surface | 2.9 Agricultural Meteorology | 2 mm 5 mm 10 mm |
0.25 km 20 km 50 km |
24 h 36 h 3 d |
24 h 30 h 2 d |
Global | reasonable | 2003-10-20 | ET ODRRGOS | Evaluation of soil moisture and avail to plants | |||||||||
54 | Accumulated precipitation | Near Surface | Climate-AOPC (deprecated) | 1 mm 1.3 mm 2 mm |
100 km 200 km 500 km |
12 h 16 h 24 h |
24 h 3 d 12 d |
Global | firm | 2007-07-19 | AOPC | ||||||||||
204 | Accumulated precipitation | Near Surface | GEWEX (deprecated) | 0.5 mm 1 mm 5 mm |
50 km 100 km 250 km |
60 min 3 h 12 h |
30 d 45 d 60 d |
Global | reasonable | 1998-10-29 | WCRP | ||||||||||
244 | Accumulated precipitation | Near Surface | 2.1 Global Numerical Weather Prediction and Real-time Monitoring | 0.5 mm 2 mm 5 mm |
10 km 30 km 100 km |
60 min 3 h 12 h |
24 h 5 d 30 d |
Global | firm | 2009-02-10 | John Eyre | ||||||||||
334 | Accumulated precipitation | Near Surface | 2.2 High-Resolution Numerical Weather Prediction | 0.5 mm 2 mm 5 mm |
0.5 km 2 km 10 km |
30 min 2 h 6 h |
6 h 9 h 24 h |
Global | firm | 2011-08-04 | T Montmerle | ||||||||||
1003 | Accumulated precipitation | Near Surface | 2.5 Atmospheric Climate Monitoring | 0.5 | 1 mm 2 mm 5 mm 0.5 |
0.02 mm 0.05 mm 0.1 mm 0.5 |
50 km 125 km 250 km 0.5 |
24 h 30 d 1 y 0.5 |
24 h 7 d 30 d 0.5 |
Global | firm | 2023-05-02 | GCOS-245: The 2022 ECVs Requirements (GCOS-245) | Requirements for uncertainty are specified at 2-sigma. | Temporal Resolution: For goal: daily aggregation over period which defines the upper limit of temporal sampling For breakthrough: monthly aggregation over period which defines the upper limit of temporal sampling For threshold: aggregation over period which defines the upper limit of temporal sampling | ||||||
1124 | Accumulated precipitation | Near Surface | 4.1 Hydrological Forecasting and Real-time Monitoring | 0.5 mm 2 mm 5 mm |
10 km 30 km 100 km |
60 sec 3 sec 12 sec |
1 sec 5 sec 30 sec |
Global | reasonable | 2024-05-01 | Emmanuel Brocard | Depends on purpose and catchment. | |||||||||
1126 | Accumulated precipitation | 2.1 Global Numerical Weather Prediction and Real-time Monitoring | 0.5 | 1 mm 1 mm |
60 min 1 sec 1 sec 0.5 |
2 sec 2 h 2 d 0.5 |
Global | firm | 2024-11-14 | AOPC | |||||||||||
1127 | Accumulated precipitation | 6.2 Understanding Earth System Processes | 1 mm 2 mm 3 mm |
2 sec 10 sec 4 sec |
10 sec 15 sec 20 sec |
Global | speculative | 2029-09-02 | WCRP (M.Rixen) |