Requirements defined for River discharge (2)
This tables shows all related requirements. For more
operations/filtering, please consult the full list of
Requirements
Note: In reading the values, goal is marked blue,
breakthrough green, threshold orange
Application-dependent Technical Priority (ATP) Magenta and Relative priority of the attributes Red
Id | Variable | Layer | App Area | ATP | Uncertainty | Layer/s Quality | Coverage Quality | Stability / decade | Hor Res | Ver Res | Obs Cyc | Timeliness | Coverage | Conf Level | Val Date | Source | General Comment | Application Area Comment | Horizontal Coverage Comment | Observation Comment | Performance Comment |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
676 | River discharge | Land surface | Climate-TOPC (deprecated) | 5 m^3 . s^-1 7 m^3 . s^-1 10 m^3 . s^-1 |
10 m 20 m 100 m |
60 min 2 h 7 h |
30 d 45 d 90 d |
Global land | reasonable | 2007-07-19 | TOPC | ||||||||||
818 | River discharge | Land surface | 2.5 Atmospheric Climate Monitoring | 24 h | Global | reasonable | 2019-09-30 | GCOS-200: The Global Observing System for Climate: Implementation Needs (Published 2016) | Requirements in the GCOS-200 IP, Annex A, are only specified at the goal level. Requirements for uncertainty and stability in the GCOS IP are specified in different units than in OSCAR/requirement |